Volume 4, Issue 1 (3-2017)                   IJRARE 2017, 4(1): 1-11 | Back to browse issues page


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Ghodrati B, Ahmadi A, Galar D. Reliability Analysis of Switches and Crossings – A Case Study in Swedish Railway. IJRARE 2017; 4 (1) :1-11
URL: http://ijrare.iust.ac.ir/article-1-124-en.html
University of Technology, Division of Operation and Maintenance Engineering
Abstract:   (2177 Views)
It is reported that switches and crossings (S&C) are one of the subsystems that cause the most delays on Swedish Railways while accounting for at least 13% of maintenance costs. It is the main reason for choosing to base this study on this subsystem.
Intelligent data processing allows understanding the real reliability characteristics of the assets to be maintained. The first objective of this research is to determine the S&C reliability characteristics based on field data collection. Because field failure data are typically strongly censored, an especial statistics software package is developed to process field failure data, as commercial packages have not been found satisfactory in that respect. The resulting software, named RDAT® (Reliability Data Analysis Tool) has been relied upon for this study. It is especially adapted for statistical failure data analysis. In the next step the availability of studied switches and crossings is estimated based on the reliability characteristics founded in the first step. 
Full-Text [PDF 591 kb]   (1369 Downloads)    
Type of Study: Research | Subject: Railway track and structures

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | International Journal of Railway Research

Designed & Developed by : Yektaweb