Volume 4, Issue 1 (3-2017)                   IJRARE 2017, 4(1): 29-35 | Back to browse issues page


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Ahadi H R, Alaei S, Amini S. Developing a Framework for Prioritizing and Selection of Civil Projects Contractors at Tehran Municipality. IJRARE 2017; 4 (1) :29-35
URL: http://ijrare.iust.ac.ir/article-1-125-en.html
School of Railway Engineering, Iran University of Science and Technology
Abstract:   (2419 Views)
Prioritizing and selection of contractors are significant in many civil projects. Contractors are the fundamental part of civil projects and they have significant role in turning existing resources into products and services. Therefore, implementation of projects requires an appropriate contractor. Usually contractors are selecting based on the lowest recommended cost. But there are other qualitative and quantitative criteria with different degree of significance that should be considered for selection of contractors. In this paper, in addition to identifying effective criteria for selecting contractors, the significance and priority of criteria is determined by applying a group AHP model for one of the big civil projects of Tehran Municipality.
Full-Text [PDF 371 kb]   (834 Downloads)    
Type of Study: Research | Subject: Railway track and structures

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | International Journal of Railway Research

Designed & Developed by : Yektaweb